
06 · Operations & Services
Operations
& Services
Care behind the experience
06.1
Care behind
the experience
Presentation brings people in. Consistent care helps the place feel right when they arrive. Our operating approach puts the common areas, visitor comfort and coordination with tenants at the centre of the management brief.
- Management supportA point of contact for shared-site coordination.
- Parking & arrivalVisitor movement and parking within the operating plan.
- SecuritySite arrangements coordinated with daily activity.
- CCTVMonitoring provisions within the security plan.
- CleaningCare for the common spaces around every visit.
- MaintenanceUpkeep of shared facilities and site systems.
06.2
A welcome from
the first moment
The first impression should feel organised. Entrance visibility, parking coordination and clear movement help set the tone before a guest reaches your door.
These details belong in a shared site plan, with tenant servicing considered alongside the visitor experience.
- Clear arrival
- Coordinated parking
- Connected movement

06.3
Room for your concept,
clarity for your team
Any mezzanine is tenant-built if required. The 50% commercial allowance remains chargeable whether or not it is built.
- Core & shellUnit interior, utility connection arrangements and drainage points per specification. Project guidelines and handover coordination.
- Tenant fit-outGlazing and signage, internal finishes, equipment and furniture. Tenant meters, operating licences and approved outdoor furniture.

06.4
Three-phase
electrical schedule
- O1–O6 · H1–H4 · DT1 · DT2 · DT4 · DT545 kVA · 63 A per phase
- DT370 kVA · 100 A per phase
- GR150 kVA · 220 A per phase
- G120 kVA · 175 A per phase
Confirm equipment loads, fit-out design and approvals through the technical review.
Questions tenants ask
Before you sign
What is delivered with the unit?
Core & shell: the unit interior, utility connection arrangements and drainage points per specification, with the project guidelines and handover coordination.
What does the tenant fit out?
Glazing and signage, internal finishes, equipment and furniture, tenant meters, operating licences and approved outdoor furniture.
Is the mezzanine built?
Any mezzanine is tenant-built if required. The 50% commercial allowance remains chargeable whether or not it is built.
Are the outdoor areas confirmed?
Drive-thru outdoor areas are owner-confirmed. Outdoor areas for O1–O6, G and H1–H4 are pending, and dashed placements on the plans are proposals.
How are commercial terms agreed?
Commercial terms are discussed separately, with clarity from the outset.
Next chapter